BASKETBALL COURT CONSTRUCTION

The City is accepting sealed bids for construction of a basketball court.

SHADE STRUCTURES CONSTRUCTION

The City is accepting sealed bids for construction of shade structures.

Swimming Pool Paint

#1 40 Gallons F161-BLLK TNEMEC – FASCURE TANK WHITE (PART A) – 5 GALLON CONTAINERS #2 40 Gallons F161-BLLK TNEMEC – FASCURE TANK WHITE (PART B) – 5 GALLON CONTAINERS #3 5 Gallons F041-00. . .

Playscape

Sealed bids for furnishing all labor, materials, tools, services and equipment necessary to complete the construction of a playscape at park. The work described above includes furnishing, installing a. . .

Park Pavilion

The Township will receive single prime sealed bids for the proposed Park Pavilion.

Outdoor Leisure Pool Project

Project will include a zero depth pool of apx 5000 sf, activities pool apx 32 feet wide by 75 feet long, toddler pool apx 1700 sf, a lazy river apx 250 feet long, water slides, shaded areas and play s. . .

Park Improvements

Demolition and removal of existing park structures, site grading with utilities, paving, pavilion and restroom buildings, landscaping, irrigation, basketball and tennis courts, playground equipment, s. . .

Outdoor Fitness Equipment

Outdoor Fitness Equipment for Park

Outdoor Furnishings

Tables/Benches/Bleachers/Receptacles/Rack

RFP Hosted Web-Based Recreation Management Software

County is accepting proposals for hosted web-based recreations management software for the Parks and Recreation Department.

Dog Park Improvements Project

Proposed improvements to Dog Park ('the park') will consist of three (3) parts. Part 1 includes the installation of two (2) ADA compliant human and canine drinking fountains installed on concrete slab. . .

PLAYGROUND,RECREATIONANDPARKEQUIPMENT

The State Department of Administrative Services (“DAS”) is issuing this ITB to solicit bids for PLAYGROUND, RECREATION AND PARK EQUIPMENT for all using state agencies and political subdivisions of the. . .

Aquatic Facility Renovations

The Town is accepting bids for contractor to renovate the swimming pool facility located within Park. The existing swimming pool shall be partially removed. The proposed facility will replace the curr. . .

Kiddie Pool, Phase 2

A description of the work of this project can be summarized to include a new free standing restroom and concessions building including twelve (12) individual restrooms, a janitor’s closet, and a large. . .

Supply and Delivery of Replacement Pathway Lighting

The work to be done under the contract shall consist of supply and delivery of replacement pathway lighting.

Light Fixtures Phase II

Lighting, Area, Pole or Standard Mounted (Parking Lots, etc.) Lighting Fixtures, Outdoor: Floodlights, Spotlights, Yard Lights, and all other Weatherproof Fixtures (Except Streetlights) (Including R. . .

Playground Equipment

Playground equipment for school.

Park Splash Pad

The work generally consists of: Construction of a 3,800 sq. ft. splash pad, equipment and restroom building, retaining wall, fencing, sidewalk, relocation of utilities with associated excavation and g. . .

Playground and Park Equipment

VOLLEYBALL EQUIPMENT SHADE SCREENS, LOUVERED OR PERFORATED BUILDINGS, LARGE, PREFABRICATED (OVER 500 SQ.FT. BUILDING (500 SQ.FT. AND UNDER) GAZEBOS SHELTERS, NON-INSULATED LOUNGE FURNITURE, STEE. . .